Overview

Status
Live Company
On the ACRA register
Company age
46 years
Since 29 Dec 1979
Entity type
Local Company
Private Company Limited by Shares
Company address
19 Gul Crescent
Singapore 629528

ZENITH ENGINEERING PTE LTD (UEN 197904024Z) is a live private company limited by shares in Singapore. It was registered on 29 December 1979 and has operated for 46 years. Its primary (principal) activity is installation of industrial machinery and equipment, mechanical engineering works (SSIC 28300), and its secondary activity is iron and steel foundries (SSIC 24310). Since 2020 it has won 1 government contract from 1 public agency. Its registered address is 19 Gul Crescent, Singapore 629528.

About the business

Zenith Engineering, which trades as Terberg Zenith, makes and supplies refuse collection bodies, bin lifts, compactors, road tankers and tipping trailers for the waste, recycling and logistics industries in ASEAN, and gives after-sales service.

Services

  • Rear loader refuse bodies
  • Side loader refuse bodies
  • Bin lift systems
  • Electric collection vehicles
  • Road tankers and tipping trailers
  • Stationary and mobile refuse compactors
  • Organic waste bodies
  • After-sales service

Parent company: Terberg Environmental Holding BV

Profile

Company information

Legal name
ZENITH ENGINEERING PTE LTD
UEN
197904024Z
Status
Live Company
Entity type
Local Company
Company type
Private Company Limited by Shares
Incorporated
29 Dec 1979 (46 years ago)
Annual return
30 Sep 2025
Accounts due
31 Jul 2026
Officers
18

Address and contact

Registered address
19 GUL CRESCENT, Singapore 629528
Area
Gul Circle, Pioneer (West Region)
Postal district
D22 (Jurong)
Email
sales.tz.sg@terberg.com
Phone
+65 6861 1100

Website and social

Website
www.terbergzenith.com.sg (brand website)
Social

Government

Contracts

ZENITH ENGINEERING PTE LTD won 1 government contract from 1 public agency through GeBIZ since April 2020. The total award value is S$134,840.

TenderAgencyAwardedAmount
TENDER FOR REPLACEMENT AND MAINTENANCE OF A WASTE COMPACTOR AT THE ENVIRONMENT BUILDING FOR A PERIOD OF THREE (3) YEARS WITH AN OPTION TO EXTEND FOR THREE (3) YEARSENV000ETT20300002Ministry of Sustainability and the Environment Ministry of Sustainability and the Environment 27 Oct 2020 S$134,840